Las Vegas Loop at the LVCC
The project consisted of drilling rock 40 feet underground to construct a tunnel loop that connects two (2) separate stations at the Las Vegas Convention Center. The stations allow visitors transportation in Model X and Model 3 Teslas to minimize travel times between different halls located at the Las Vegas Convention Center. As part of the QAA Team, The Centurion Team performed welding and NDT special inspections and field testing services on this project. This project was completed in March 2021.