Pedestrian Bridge Separation Las Vegas Blvd. at Park Ave.
For this project, The Centurion Team performed quality control services for soils, concrete and reinforced concrete associated with the structures (bridge, escalator, elevator and stairways) and crosshole sonic logging (CSL) for the drilled piers, and deep foundation inspections. The new bridge allows a safer way for pedestrians to cross Las Vegas Boulevard. The Centurion Team also performed staff augmentation services for the QCC and QCM positions.
