Flashing Yellow Arrow (Phase 2) and Traffic Signal Improvements at Various Locations
Las Vegas, NV This project consisted of traffic signal improvements for seven (7) different intersections. […]
Read More
Las Vegas, NV This project consisted of traffic signal improvements for seven (7) different intersections. […]
Read MoreLas Vegas, NV This $26.9M highway widening project consisted of removing existing improvements, construction and […]
Read MoreLas Vegas, NV This $18.2M+ project consisted of installing approximately 18,050 feet of 36-inch and […]
Read MoreLas Vegas, NV The project consists of constructing a precast concrete pedestrian bridge over Summerlin […]
Read MoreLas Vegas, NV Major roadway, pipeline, utility, and traffic signal system improvements were constructed in […]
Read MoreLas Vegas, NV For this project, The Centurion Team performed quality control services for soils, […]
Read MoreMercury, NV This project consisted of constructing a single story 13,996 square foot building. This […]
Read MoreLas Vegas, NV The Centurion Team performed owner quality assurance inspections and materials testing for […]
Read MoreLas Vegas, NV The project consisted of drilling rock 40 feet underground to construct a […]
Read MoreNorth Las Vegas, NV The project consists of constructing a 2,489 square foot training facility, […]
Read MoreLas Vegas, NV This $4.3B mega-resort was constructed on an 87-acre site on the northwest […]
Read MoreLas Vegas, NV The Centurion Team was on the team to perform QAA Materials Testing […]
Read More